Water treatment plant, Eindhoven, Niederlande

  • Gebäudeart:
  • Industriegebäude
  • Infrastruktur
Vollbild Schliessen Street View

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

Projektdaten

Projektentwickler:
Waterschap De Dommel
Bauunternehmen:
Van Boekel Bouw & Infra
Fertigteilwerk:
Haitsma Beton
Lieferzeitraum:
2019
Fertigstellung:
2020