Four Seasons Staff Housing, Dubai, Vereinigte Arabische Emirate

  • Gebäudeart:
  • Wohngebäude
Vollbild Schliessen Street View

Built in the heart of an active industrial area of Dubai, the Four Seasons Staff Housing project is a distinguishable building among the surrounding environment. The design’s original time and cost estimates were met by using Peikko's DELTABEAM® solution. 

 Consisting of two parallel buildings with a central connection, the H-shaped structure stands out with floor-to-floor windows built within concrete blocks. The original design featured cast-in-place concrete columns and cast-in-place post-tensioned slabs with external concrete block walls.

The design consists of precast insulated cladding panels, internal precast frames and walls, and Hollow Core Slabs with the following key features:
• Continuous insulation with no thermal breaks
• Flat slabs at cantilevers and corridors
• Fast construction
• Reduced internal finishes

In 2014, the project received Honorable Mention under the Multifamily Housing category at the prestigious PCI Awards. 

www.econstruct.ae

Mehr lesen… down-arrow.png

Projektdaten

Nutzfläche:
21000 m2
Geschosse:
5
Projektentwickler:
Bright Start LLC
Bauunternehmen:
Dubai Contracting Company
Fertigteilwerk:
e.construct
Lieferzeitraum:
2014
Fertigstellung:
2014

Kontakt

Nirajuthan Selvarajah

Nirajuthan Selvarajah

Project Manager

UAE

[email protected]