Castelein distribution centre, Puurs, Belgien

  • Gebäudeart:
  • Lager & Logistik
  • Bürogebäude
Vollbild Schliessen

Castelein's new distribution centre in Puurs is build with concrete columns of almost 30 meters in length, Normally, the organisation concercing temporary bracing is a lot of work, but with Peikko's bolted connections a lot of precious time, materials and space was saved. Because no temporary bracing was needed, the building site was easily accessible for the workers and transports.

Projektdaten

Nutzfläche:
12,000 m2
Lieferzeitraum:
2017
Fertigstellung:
2018

Lösungen von Peikko